SA01 Campus, 1.2 GW, phased on your schedule

Status: Available

The SA01 Campus is a gigawatt-class data center campus on AEP's ERCOT-connected grid, with direct 345 kV interconnection and data-center zoning approved by-right.

Campus snapshot

Room to Grow, Power to Match

The SA01 Campus gives operators direct grid access and 347 acres to grow into, clear of the land and power constraints that limit Texas's primary metros. Power arrives in phases, beginning in 2028 and scaling to 1.2 GW, with a clear runway from first energization to full capacity.

Flyover Video

Tour our SA01 development from a new perspective. Get an insider’s look at our new build.

Watch the Video

SITE PLAN

575 MW in Phase I, scaling to 1.2 GW, with direct connect to AEP's Red Creek station.

Phased to match demand

Phase I delivers 575 MW by summer 2028. Phase II adds 625 MW after 2030, bringing the campus to 1.2 GW. Each phase scales without disrupting the last.

Direct grid access

Direct 345 kV interconnection to AEP's Red Creek station, with dual 345 kV circuits and N+1 electrical infrastructure.

Clear, zoned, and ready

347 acres annexed into the City of San Angelo with data-center zoning by-right, on land that sits clear of the floodplain.

Local Context

We know a campus this big raises questions.

A 1.2 GW campus is a major addition to any community, and a project this size should invite hard questions. In SA01, water came first, as it should in West Texas.

So we designed it. 


The campus uses air-cooled, closed-loop chillers, which keep its draw on local water low even as it scales to 1.2 GW. We keep working with residents and local officials as the project moves ahead.

 

Development Timeline 

We've secured the land, zoning, and an AEP letter agreement for 575 MW of power. Power is delivered in phases, on a defined schedule from first energization to full capacity.


NOW

Customization open

SUMMER 2028

Phase I
energization, 575 MW

POST 2030

Phase II
expansion to 1.2 GW total

Downloadable resources

Everything we publish about our SA01 Campus, in one place.

Specifications evolve as we move through entitlement and construction. Each document is dated, and the version on this page is always the most recent. Older versions are available on request.

SA01 Campus Brochure

Download

Technical Specification Sheet

Download

Community benefit agreement

VIEW

Schedule a Site Visit

Contact Emergent Data Centers to discuss current campus availability, deployment timelines, or future development opportunities. Our team is available to support hyperscale operators, enterprise customers, and investment partners.